Gallery – Construction Updates
Location:
1005 1st Street S.W.
Estimated Completion:
Jan. 1st 2027, and not later than Dec. 31st, 2027
Current Progress:
Stage 1: Approvals
Stage 2: Foundation
Stage 3: Rough-ins
Stage 4: Finishing
Stage 5: Inspection
Stage 6: Occupancy

Latest Updates:
Gallery has now reached Level 19, where the building’s rooftop amenity space will be located. Exterior windows are installed up to Level 13, and interior walls are being framed on Level 12. Plumbing, electrical, heating, and ventilation work has reached Level 10, while kitchen cabinets and other built-in finishes are being installed on Level 6